Client:   FLS Energy
Location:   Bend, OR
Year Completed:   2017

      This 80-acre solar farm project required the excavation and embankment of over 70,000 CY.  To contend with the basalt rock, blasting and rock crushing was performed to make usable material.  To meet the schedule work was performed 12 hours a day, 7 days a week for over 3 months.